Photo 1 of 9
$1,100,000
| Beds |
Baths |
Sq. Ft. |
Taxes |
Built |
| 3 |
2.10 |
1,762 |
0 |
2027 |
|
On the market:
0 days
|
Est. Monthly Payment:
$6,586($6,586 + $0 taxes*)
View full details, photos, school info, and price history
The best residence in Phase 1 at Aster Court, this desirable end unit will face quiet Baird Street and shares just one wall. It is the only home in the phase with side-by-side two-car garage parking and a wrap-around main-level porch. Site work started November 1st, 2026 and move in is set for April of 2028! Phase 2 is expected to be priced higher, so this is a chance to buy at Phase 1 pricing. The Heath plan offers up to four bedrooms over three living levels: an open main floor for living, dining, and kitchen that opens onto the wrap-around porch; two bedrooms and laundry on the second floor; and a top floor with a bedroom, private porch, bonus room, and owner’s bath.
Amarx Construction builds every home to a high standard, with 9-ft ceilings, engineered hardwood floors, Fabuwood soft-close cabinetry with 42-inch uppers, Silestone quartz countertops, and a KitchenAid stainless induction appliance package. The owner’s shower is tiled with frameless glass, and the home also includes Delta fixtures, Kohler comfort-height toilets, Pella windows, a smart-doorbell-ready entry, Cat-6 wiring, and AT&T Fiber.
Buyers finish the home their way at Amarx’s Studio A design center. Upgrade options include Thermador or Wolf/Sub-Zero appliance packages, French oak or hickory flooring, waterfall quartz ends, farmhouse or workstation sinks, cabinets to the ceiling, a pot filler, designer lighting collections, and modern gold or matte black finishes. You can also add an electric fireplace with cedar mantle, custom closet systems, an EV charger, and an epoxy garage floor.
From historic Chestnut Hill, you can walk to Jettie Rae’s Oyster House, City Bakery, Mamacita’s Taco Temple, The Chop Shop, OWL Bakery, Bone & Broth, and Starbucks. Harris Teeter, Trader Joe’s, and Whole Foods are minutes away, and downtown Asheville is less than half a mile off. Completion is set for April 2028.
Listing courtesy of William Coin, Howard Hanna Beverly-Hanks Biltmore Avenue